Search
Close this search box.
Market: Bridges County Government Highways & Roads Region: New Jersey

Burlington-Bristol and Tacony-Palmyra Bridges

City of Burlington & Tacony, Burlington County, NJ

Provided a full range of engineering services for the toll plaza enhancements at the Burlington-Bristol Bridge and the Tacony-Palmyra Bridge, both in Burlington County. The Colliers Engineering & Design team analyzed the current conditions of the toll booth configurations and roadway approaches for the two bridges and prepared an assessment report of their findings.

The Commission then retained the Colliers Engineering & Design team to provide full design services for the suggested improvements, including the installation of crash attenuators, rumble strips, and a median barrier; the improvement of pavement markings at the toll approaches; the utilization of Intelligent Transportation Systems (ITS) signage; widening of the roadway; and extensive pavement rehabilitation. Services were provided through every stage of the project, from assessment and preliminary design, to construction inspection and administration and project close-out. M&PT was also provided during the project, which was completed on time and within budget.

 

Share this:

SERVICES

  • Bridge Engineering
  • Construction Engineering & Inspection
  • Construction Management
  • Geotechnical
  • Structural Engineering